Safety Initiatives
Inspection
-
At the Start of Use
Supply Start Inspection
At the time of gas activation, we check the installation of the gas cylinder, gas meter, and gas pipes, conduct a leakage test, and perform a trial run of gas appliances.
-
Once a Month or More
Daily Inspection
We inspect the supply equipment during regular meter readings and cylinder replacements.
-
More than once every 4 years
Regular Inspection
This is a regular inspection conducted at least once every four years after the initial gas activation inspection. The inspection is the same as the one performed at the start of supply.
Emergency
We are available 24/7 by phone to handle emergency reports such as gas leaks or gas odors. In case of an emergency, our staff will immediately dispatch from our various offices to the site and take the necessary actions to ensure safety.
Safety Devices

Gas Alarm System
(For Apartment Buildings)
The system is linked to the building's overall alarm system, and in the event of an alarm, it automatically connects to the management center or similar facility. Additionally, the gas leak status is displayed on the intercom.

Gas Alarm System
(Commercial Kitchen Equipment)
Linked with the gas meter, the system stops the gas supply when an alarm is triggered.
It can be installed in locations where water may splash, such as in waterproof models.

Microcontroller Meter
The microcontroller built into the gas meter detects abnormalities and shuts off the gas supply.

Commercial Ventilation Alarm System
This system detects the concentration of carbon monoxide generated by incomplete combustion of gas appliances due to poor ventilation and triggers an alarm before it affects the human body.